  1. floor, it is recommended that you use those recommended by other factories or us.
  2. When flooring, please keep the floor moist but no water left(seeper), the volume proportion of cement and mortar used for leveling the floor is 1:3; the mixed cement mortar should be to the extent that it can be a group when grasping by hand and will spread when landing on ground. (we suggest don’t use white cement is best)
  3. If flooring by using the white cement, its quality and strength must be strictly checked, as the quality of different brands on market are various and some very bad ones are among them, so it is recommended the you’d better not use the white cement for big and key projects.
  4. When tiles are stacked outdoors, please cover them with water-proof cloth against rain.
  5. When flooring the ground, 2m joints need be set aside between tiles to facilitate the evaporating the moisture in cement mortar and offsetthe expanding stress. When flooring large area, 8mm joint need be set aside every 5m in length and breadth to prevent the tiles of prominency and contraction by expanding of surface and structure.
  6. When Lixin Quartz tiles are used for ground flooring and use the method of Flooring together with leveling, the tiles need be covered with damp cloth by 24 hours firstlybefore using, the joints should be filled and no steps on them 3-5 days after flooring.

Limit to length, we only list the kinds and procedures of flooring, If you need detailed ones and tips, please contact us by email, thanks.